Aztec Minerals Corp.: Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6.36 gpt Gold Equivalent over 7.62 m and 0.62 gpt Gold Equivalent over 140.21m
Aztec Minerals Corp.: Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6.36 gpt Gold Equivalent over 7.62 m and 0.62 gpt Gold Equivalent over 140.21m High-grade gold-silver intercepts include 6.36 gpt AuEq over 7.62 m Thick gold-silver intervals include 0.62 gpt AuEq over 140.21 m 19 holes of 21 holes completed in 2,993 meters Phase 1 drilling program encountered significant near surface oxide gold-silver mineralization VANCOUVER, BC / ACCESSWIRE / December 22, 2020 / Aztec Minerals Corp. (TSXV:AZT)(OTCQB:AZZTF) announces the results of the f...