New construction at BYU raises ongoing questions about parking availability for students
As the new music building finished construction, and the Harris Fine Arts Center came crumbling down, students had one question: What about student parking?
Stay updated with breaking news from Clark Building. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
As the new music building finished construction, and the Harris Fine Arts Center came crumbling down, students had one question: What about student parking?
The damage was discovered Saturday, two days after an arctic cold front slammed Colorado and caused a historic dip in Fort Collins temperatures.
The B and C wings of the Clark Building will be closed Tuesday, Dec. 27 – and possibly longer this week – for clean-up and repair flooding caused by frozen fan coils bursting after extreme cold temperatures last week.
Recent extreme cold temperatures led to flooding at CSU in Fort Collins due to pipes bursting.
It was December 5, 1925, 97 years ago this week, that one of New York's oldest radio stations signed on the air for the very first time. WIBX 1460 AM started broadcasting in the Clark Building in downtown Utica and the top floor of Hotel Utica. The station would move around the dial until 1948 where it would land for good at 950 AM with a power increase to 500 watts. Today the radio station is 5000 watts and also simulcasts on FM frequency 106.9.