Ground-Mount Solar Buyer's Guide 2021: Fixed Tilt and Trackers
/*** Advertisement ***/ Certifications: ASCE 7-10 & CPP Wind Tunnel Tested Installation: A pile driver installs the pile foundations for TITAN racking. APA screw machines are attached to skid steers to drive the ground screws. With the TITAN Duo, 100 percent pre-drilling is offered to ensure any bedrock or hard obstructions do not cause significant delays during installation. The racking attaches to the foundations and can be adjusted in the field to maintain the proper array height and design. Advantages: The TITAN’s unique asymmetrical design and innovative features allow for flexibility ...