How a vehicle breakdown disrupted Bengaluru Metro's Green Line services for over 10 hours
17-tonne road-rail vehicle needed to be lifted off the Metro rail track, which was about 13 meters high, and lowered to the ground using a 250-tonne hydraulic crane.
Source: moneycontrol.com