A15 resurfacing brought forward after potholes blight
A15 resurfacing brought forward after potholes blight Disgruntled driver measured a huge pothole This pothole near the Brauncewell junction of the A15 was described as a "crater". | Photo: Andrew Hodder Resurfacing works on the A15 from Sleaford to Lincoln have been brought forward to this year, as large potholes have appeared in recent weeks. The stretch of road between Sleaford and Lincoln on the A15 has been affected by the winter weather over the Christmas period, with several dangerous potholes developing. The main bulk of the holes can be found while heading towards Lincoln, just before...