Angola TOTAL Starts Production From Zinia Phase 2 Successful Short-Cycle Development On Block 17
Angola: TOTAL Starts Production From Zinia Phase 2, Successful Short-Cycle Development On Block 17 Total, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency, announce the start of production from Zinia Phase 2 short-cycle project, connected to existing Pazflor’s FPSO (Floating Production, Storage and Offloading unit). The project includes the drilling of nine wells and is expected to reach a production of 40,000 barrels of oil per day by mid-2022. Located in water depths from 600 to 1,200 meters and about 150 kilometers from the Angolan coast, Zi...