Angola: Angola: Total starts production from Zinia Phase 2, successful short-cycle development on Block 17
Angola: Total starts production from Zinia Phase 2, successful short-cycle development on Block 17 06 May 2021 Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency, has announced the start of production from the Zinia Phase 2 short-cycle project, connected to the existing Pazflor’s FPSO (Floating Production, Storage and Offloading unit). The project includes the drilling of nine wells and is expected to reach a production of 40,000 barrels of oil per day by mid-2022. Located in water depths from 600 to 1,200 meters and about 150 kms from the Angolan coast...