Consultants: Design issues, operation lapses led to big Kansas oil spill
Pipeline design issues, lapses by its operators and problems caused during its construction led to a massive oil spill on the Keystone pipeline system.
Stay updated with breaking news from Keystone One. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Pipeline design issues, lapses by its operators and problems caused during its construction led to a massive oil spill on the Keystone pipeline system.
TOPEKA — Pipeline design issues, lapses by its operators and problems caused during its construction led to a massive oil spill on the Keystone pipeline syste
An engineering consulting firm said in the report that the bend in the Keystone system where the December 2022 spill occurred had been “overstressed” since its installation in December 2010
An engineering consulting firm said the bend had been "overstressed" since its installation in December 2010.
Public universities in Kansas push for a tuition hike... authorities seize 70 animals and arrest two Coffeyville residents on charges of animal cruelty... and a $17,000 reward is posted in the case of Kansas City area thieves who are cutting fiber optic cables in a misguided search for copper. These stories and more... here.