Hon. William Everette Lewallen Memorial Bridge Gets Replacement : CEG
Thu February 04, 2021 - Southeast Edition #3 Lori Lovely â CEG Correspondent Blalock began excavating for footings for the new bridge in late 2018. The foundation pilings â steel beams â are driven down 20 to 30 ft. until they reach bedrock. The steel beam pilings are wrapped with rebar; concrete forms were placed; and concrete was poured to create the abutment. Clinton, Tenn., is getting a new bridge. Rather than replace the existing, aging truss bridge, Mark Nagi, Tennessee Department of Transportation community relations officer of Region 1 in eastern Tennessee, said "repla...