HS2 completes 6,200t bridge drive under West Cost Main Line
The 56m long and 19m wide structure was built adjacent to the WCML at Fulfen Wood, near Lichfield, over the last six months. The build was led by Byrne
Source: newcivilengineer.com
Stay updated with breaking news from Lichfield High Level. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The 56m long and 19m wide structure was built adjacent to the WCML at Fulfen Wood, near Lichfield, over the last six months. The build was led by Byrne