Investegate |Calibre Mining Corp. Announcements | Calibre Mining Corp.: Calibre Exceeds High End of 2020 Production Guidance With 136,009 Ounces and Beats Low End of All-in Sustaining Cost[1] Guidance at $1,043 Per Ounce
Limon: Q4 2020 Total mine production consisted of 219,428 ore tonnes at an average grade of 4.28 g/t gold. The majority of the mine production originated from the Limon Central (173,651 tonnes at an average grade of 4.51 g/t gold), the Santa Pancha underground mine (29,559 tonnes at an average grade of 3.11 g/t gold), with the remaining tonnes mined from Veta Nueva. Effective June 1, 2020, the Company considers Limon Central Phase 2 to be in commercial production and defers stripping waste material above the average life of mine waste : ore strip ratio. Limon produced 19,006 ounces driven by ...