SFGTV2 September 15, 2013
Tension concrete structure, great idea. We did that. A lot of other things. And we came up with a price of 140 million. So, we achieved that goal. And, so, when we first started looking at the building, it was going to cost a lot of money. Because of the way it was being built, we could only get 12 floors. We wanted more space for our employees. We ended up going and saying, okay, if we do a concrete building instead, which was web cores idea, we can get 13 floors, not 12 floors. The concrete doesnt require much space between the floors as a Steel Building does. And it could be cheaper. Yes, m...