Unigold Identifies NEW, Near Surface, High Grade Mineralization at Candelones Extension
(2) Drilled interval reported includes 44.0m of barren dike material, the grade of which has been assumed to be 0.00 for all metals. (3) Drilled interval reported includes 10.0m of barren dike material, the grade of which has been assumed to be 0.00 for all metals. Holes LP20-167, LP20-169 and LP20-165 (previously reported in PR 2021-03), were drilled as a fence of holes in a SW direction, perpendicular to the dominant NW drill orientation. This alignment roughly parallels the andesite-dacite contact which is interpreted to control the low-grade mineralization halo. The holes were designed to...