(2) Drilled interval reported includes 44.0m of barren dike material, the grade of which has been assumed to be 0.00 for all metals. (3) Drilled interval reported includes 10.0m of barren dike material, the grade of which has been assumed to be 0.00 for all metals. Holes LP20-167, LP20-169 and LP20-165 (previously reported in PR 2021-03), were drilled as a fence of holes in a SW direction, perpendicular to the dominant NW drill orientation. This alignment roughly parallels the andesite-dacite contact which is interpreted to control the low-grade mineralization halo. The holes were designed to test interpreted high-angle northwest to northeast trending fault zones that disrupt the high grade mineralization at both Targets A and B while providing intersections of both Target A and Target B. All three holes intersected evidence of faulting (Ref. Figure 2.0) which is currently being assessed prior to positioning follow-up drill holes.