Petersburg assembly advances bond measure for electrical generation
Petersburg assembly advances bond measure for electrical generation Posted by Joe Viechnicki | Jul 20, 2021 Water from Crystal Lake is drained through a penstock to a powerhouse at Blind Slough. (Joe Viechnicki/KFSK) Petersburg’s borough assembly Monday approved the first reading of a ballot question on bonding for Petersburg’s electrical system. The measure would be one of two to appear on the October 5 th ballot and could shore up both hydro and diesel power generation for electrical customers on the island. The 7.8 million dollar bond would pay for an overhaul and upgrades at the borou...