SFGTV January 13, 2014
The notice red tagged but as i recall it was touch and go to whether ms. Top of could stay there her home in 2005. This was serious and it led to the then District Supervisor shawn. Several of the visits from the inspection namely Raymond Louie to name some. In the previous version of the construction drawings that ive reviewed in september 2013. I indicated the 24 inch would be measured to the bottom of the concrete foundation. Let me see. I think i can maybe i can work maybe i should turn it around. Okay. This is the line of the original foundation of the north foundation of 25 trouf and the...