Vimarsana
Biggest News Aggregation in the World

Page 4 - Structural Failure News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from Structural Failure. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In Structural Failure Today - Breaking & Trending Today

WindAction | Applied Materials' wind turbine coming down for good - Vimarsana News

WindAction | Applied Materials' wind turbine coming down for good

In what will be a dramatic shift for the Gloucester skyline, Applied Materials Inc. on Dory Road is decommissioning its towering wind turbine and taking it down. This after one of the turbine’s three 160-foot-long blades tumbled straight down to the ground and snapped in two sometime overnight on Sunday, July 31, 2022. ...The formerly 492-foot wind turbine, measured from its base to the top of its fully outstretched blades — the others were removed last November — is in Blackburn Industrial Park on Applied Materials’ campus.

Busy Rhode Island bridge closed suddenly after structural problem found, and repair will take months - Vimarsana News

Busy Rhode Island bridge closed suddenly after structural problem found, and repair will take months

Authorities have found a critical structural failure in one of the busiest bridges in Rhode Island and have closed its westbound side to begin a repair job expected to take months. The Rhode Island Department of Transportation said Monday evening that a “critical failure of some original 1960s bridge components” was located in the bridge. All westbound lanes will be closed and traffic diverted at first, the agency said.

Source: yahoo.com
WindAction | Chinese turbine collapse and 'serious casualty' prompts order for day-long local shutdown - Vimarsana News

WindAction | Chinese turbine collapse and 'serious casualty' prompts order for day-long local shutdown

The collapse of a wind turbine in China has prompted a state authority to order a daylong shutdown of projects in the region to tackle safety failings. The Xinjiang Supervision Office of China’s National Energy Administration issued the notice on 3 November following the collapse of a turbine being constructed by China Power Construction Barkol New Energy Co. during electrical installation work. The company is reportedly developing a 600MW wind farm using 7.15MW turbines near Hami, a city in the northwestern Xinjiang province. No website or contact details for the c...

WindAction | Massive fire destroys wind turbine in Adair County - Vimarsana News

WindAction | Massive fire destroys wind turbine in Adair County

The fire eventually spread to the cornfields below. That created a giant plume of smoke that spread north toward Interstate 80. The smoke was visible for miles. "I was coming home at like the Dexter Exit, Redfield, like 10 miles from here, you can see the smoke everywhere," said Amy Budd, who lives nearby.

WindAction | Developer 'shares public anger' after second turbine blade snaps at German wind farm - Vimarsana News

WindAction | Developer 'shares public anger' after second turbine blade snaps at German wind farm

It is the second breakage at the Alfstedt-Ebersdorf project, where a similar incident occurred in September last year. Energie Kontor repaired and recommissioned the broken turbine on that occassion but the cause has yet to be determined, the company said. A spokesperson added: "At the moment, it cannot yet be determined that the two damages were generated by the same cause."