SFGTV2 July 29, 2013
The floor above . Because the slabs on grade is a conventional slap, it is not post tension. One of the things the building designers do is to make the floor as thin as they reasonably can. There are several benefits to that. First of all, it reduces the mass of the building. We have 7. 5 inch slab. Conventional slab would probably be 10. 5 inches, which is about 25 more concrete mass. It also reduces the overall floor to floor height, which helps with the architectural facade and the square footage. One of the things people are always looking at is decreasing the floor to floor height, especi...