SFGTV2 December 25, 2012
Potentially planned for previous to that, which was a steel frame structure that used hydraulic dampers to control seismic motion. So, i met with my team. We worked hard. We came up with a great idea. Lets take out the heavy steel structure, lets put in an innovative vertical post tension concrete structure, great idea. We did that. A lot of other things. And we came up with a price of 140 million. So, we achieved that goal. And, so, when we first started looking at the building, it was going to cost a lot of money. Because of the way it was being built, we could only get 12 floors. We wanted ...