SFGTV2 November 7, 2013
Crane, not bolted down. About all of these big concrete waits . 160 pounds of concrete is the ballast week. Did you have to pour a Big Foundation under that . This is a construction method that we get to, we work with the contractor. We get a load from the crane manufacturer, figure out the downward load and the overturn load. We then make sure that the foundation can take that load. Also, all the anchors on the floor are adequate. Why would you do this instead of fastening it to a fixed base . This crane is not part of the foundation system, so it is out board of the structure. Basically, it ...