For Sale: Trailer Mounted Coiled Tubing Unit
Manufacturer: Celtic Pride (Canada)<BR/>Year Built: 2012<BR/>Prime Mover - 2012 Western Star Single
Stay updated with breaking news from Wellhead Pressure. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Manufacturer: Celtic Pride (Canada)<BR/>Year Built: 2012<BR/>Prime Mover - 2012 Western Star Single
Maha Energy reports that a preliminary free flow well test and clean-up of Tie-4 yielded an initial comingled and restricted flow rate of approx. 936 BOEPD. The rig will now be moved out and the well hooked up to the permanent oil production facilities at Tie to fully clean up and test the well.
A preliminary free flow well test and clean-up of Tie-4 yielded an initial comingled and restricted flow rate of approximately 936 BOEPD1 (825 BOPD2 and...
Brazil: Maha Energy announces strong Tie-2 flow rates 19 Dec 2020 Maha Energy has announced that the recently completed Tie-2 well is free flowing oil and gas at a rate of 1,825 BOPD and 1,083 MSCFPD (2,005 BOEPD) on a 1-1/2” choke with a stable tubing-head flowing pressure. A follow up well west of Tie 2, Tie-3, was spudded on 18th December and is expected to take about 60 days to drill and complete. The completion issues with the GTE-4 well have been rectified and the well is now being cleaned up and flowing oil and gas to the Tie Production Facilities. Jonas Lindvall, CEO of Maha Ene...