Live Breaking News & Updates on Whim road

Stay informed with the latest breaking news from Whim road on our comprehensive webpage. Get up-to-the-minute updates on local events, politics, business, entertainment, and more. Our dedicated team of journalists delivers timely and reliable news, ensuring you're always in the know. Discover firsthand accounts, expert analysis, and exclusive interviews, all in one convenient destination. Don't miss a beat — visit our webpage for real-time breaking news in Whim road and stay connected to the pulse of your community

Continuous Labour Force Sample Survey For October 2023

(FP) The Barbados Statistical Service (BSS) will commence another round of its Continuous Labour Force Sample Survey (CLFSS) from Monday, October 16. As a r ...

Durants , Christ-church , Barbados , Orange-hill , Saint-james , Ashton-hall , Saint-peter , Rock-hall , Apes-hill , Oldbury , Saint-philip , Easy-hall

Continuous Labour Force Sample Survey For July 2023

(Stock Photo) The Barbados Statistical Service (BSS) has commenced another round of its Continuous Labour Force Sample Survey (CLFSS) to capture data for th ...

Barbados , Orange-hill , Saint-james , Easy-hall , Saint-joseph , Oldbury , Saint-philip , Mile-anda-quarter , Saint-peter , Durants , Christ-church , Rock-hall

Stafford students build bedroom house

Students from Stafford County high schools completed the Bringing Occupational Opportunities to Students (BOOTS) House 27 on May 5, 2023.

Thomasw-taylor , Stafford-county , Bringing-occupational-opportunities , Whim-road , Stafford-schools-superintendent , Stafford-county-public-schools ,

BSS continuous labour force sample survey January 2023

The Barbados Statistical Service (BSS) has commenced another round of its Continuous Labour Force Sample Survey (CLFSS).

As a result, Field Officers from the department will be visiting households in several districts across the island, starting from Monday, January 30.

In St Michael, they will survey the following districts:  King Street, White Park Road, Passage Road; Baxter’s Road; Mighty Grynner Highway; Deacons

Cave-hill , Saint-lucy , Barbados , Rock-hall , Saint-peter , Orange-hill , Saint-james , Apes-hill , Easy-hall , Saint-joseph , Horse-hill , Oldbury

BRAGSA repairs a section of Fairhall road


BRAGSA repairs a section of Fairhall road
The completed resurfaced road at Fairhall
Social Share
The Roads, Buildings and General Services Authority (BRAGSA) has completed Asphalt resurfacing in the community of Fairhall, East St George.
The project saw the repair of 700 feet of roadway from Whim Road to Ribishi Gap, along with the reconstruction of a 155-foot long Cross drain.
In addition, a 55-foot long Swale Drain and 170-foot long Box Drain were constructed.
BRAGSA also built a 50-foot long retaining wall.
The project was carried out a cost of $227,000.
It was done over a six weeks period.

Ribishi , Saint-george , Saint-vincent-and-the-grenadines , Services-authority , General-services-authority , Whim-road , Ribishi-gap , Swale-drain , Box-drain , ரிபிஷி , துறவி-ஜார்ஜ்

BRAGSA road programme ongoing


BRAGSA road programme ongoing
Photos Credit: BRAGSA 
BRAGSA’s - Roads, Buildings and General Services Authority – road construction and repair programme continued with two projects.
The first was the repair of 228 feet of road in Backpiece, Troumaca, in the North Leeward constituency.  
Additionally, BRAGSA undertook and completed the construction of an accompanying 212-foot long Slipper Drain.
This five-week project cost EC$42,000.
Staying on the Leeward side of mainland St. Vincent, BRAGSA moved south into Vermont, in the South Leeward constituency, where it completed the construction of a new 253-foot long concrete road, along with a 250-foot long Box drain, in Sugar Ridge.

Ribishi , Saint-george , Saint-vincent-and-the-grenadines , Sandy-bay , Charlotte , Kingstown , Vermont , United-states , Sandy-bay-secondary-school , Kingstown-anglican-school , Services-authority

BRAGSA has completed asphalt re-surfacing in the community of Fairhall


BRAGSA has completed asphalt re-surfacing in the community of Fairhall
The project involved the repair of
700 feet of roadway from Whim Road to Ribishi Gap, along with the reconstruction of  a
155 feet long Cross drain.
In addition, a
170 feet long  Box Drain were constructed.
BRAGSA also constructed a
The project was carried out a cost of
$227,000, and was implemented over a six week period.
Share This Article:

Ribishi , Saint-george , Saint-vincent-and-the-grenadines , Services-authority , General-services-authority , Whim-road , Ribishi-gap , Swale-drain , Box-drain , ரிபிஷி , துறவி-ஜார்ஜ்