IAMGOLD Reports Additional Positive Results from Its Resource Delineation Drilling Program on the Gosselin Zone - Côté Gold Project, Ontario
Notes: Insufficient drilling has been completed to accurately determine the Gosselin Zone orientation. Actual core widths are estimated at approximately 60 to 95% of the core interval. Drill hole intercepts are calculated with a lower cut of 0.30 g/t Au. Assays are reported uncut but high grade sub-intervals are highlighted. GOS20-52 Core Interval 78.65 to 109.00 m has actual core widths estimated to be 26.6% of the core interval. * BTW drill core. Core diameter is 42.0 mm Technical Information and Quality Control Notes The drilling results contained in this news release have been prepared in...