Benz Mining Corp.: Benz Mining: 50,000m Diamond Drilling Program and Large Surface EM Survey Underway at Eastmain
First target of 2021 drill season is the newly identified footwall conductors
Numerous untested conductors from the 2020 EM campaign to be drilled in priority
FLEM underway covering 3km of potential strike extent of two trends (main mine trend and new hangingwall trend) with 2.13g/t Au rock chip sample at surface and 1m at 6.3g/t Au in an isolated shallow historical drillhole
Additional VTEM targets 1km in the hangingwall of the mine trend potentially linked to an untested additional conductive trend
2020 drilling assays expected in coming weeks