Transport experts believe that in order for the Autonomous Rail Rapid Transit (ART) network to be viable in the long term, it must be integrated with the Johor Bahru-Singapore Rapid Transit System (RTS) Link, due to be completed by end-2026, and a possibly revived High-Speed Rail (HSR) project. &n