vimarsana.com


Peshawar
March 3, 2021
MANSEHRA: The district administration has imposed section-4 to acquire land for the 300 megawatts Balakot Hydropower project being built at a cost of Rs85 billion in the Kaghan valley by the Pakhtunkhwa Energy Development Organisation.
“We have already fulfilled the legal formalities to acquire over 1700 kanals of land for the project and this ongoing process will shortly be completed,” Deputy Commissioner Dr Qasim Ali Khan told a briefing here on Tuesday.
A delegation of the Pakhtunkhwa Energy Development Organisation (PEDO) led by Advisor to Chief Minister Khyber Pakhtunkhwa on Energy and Power Himayatullah Khan visited the dam site in Kaghan valley at the end of briefing.

Related Keywords

China ,Mansehra ,North West Frontier ,Pakistan ,Balakot ,Kaghan ,Kinari ,Azad Kashmir ,Himayatullah Khan ,Qasim Ali Khan ,Khyber Pakhtunkhwa On Energy ,Pakhtunkhwa Energy Development Organisation ,Balakot Hydropower ,Pakhtunkhwa Energy Development ,Commissioner Dr Qasim Ali Khan ,Chief Minister Khyber Pakhtunkhwa ,Power Himayatullah Khan ,Suki Kinari Hydropower ,China Pakistan Economic Corridor ,Kunhar River ,Section ,Imposed ,Acquire ,Land ,Power ,Project ,சீனா ,மன்சேரா ,வடக்கு மேற்கு எல்லை ,பாக்கிஸ்தான் ,பாலகோட் ,கிணரி ,அசாத் காஷ்மீர் ,கேஸிம் அலி காந் ,கைபர் பக்துங்க்வ ஆன் ஆற்றல் ,பக்துங்க்வ ஆற்றல் வளர்ச்சி ஆர்கநைஸேஶந் ,பாலகோட் நீர் சக்தி ,பக்துங்க்வ ஆற்றல் வளர்ச்சி ,ஆணையர் டாக்டர் கேஸிம் அலி காந் ,தலைமை அமைச்சர் கைபர் பக்துங்க்வ ,சுக்கி கிணரி நீர் சக்தி ,சீனா பாக்கிஸ்தான் பொருளாதார தாழ்வாரம் ,பிரிவு ,பெறுங்கள் ,நில ,பவர் ,ப்ராஜெக்ட் ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.