vimarsana.com


Thursday, 14 January 2021
GE Renewable Energy has announced it has been selected by Leeward Renewable Energy LLC as its wind turbine technology partner in the repowering of Leeward’s 90 MW Aragonne Wind Project in Guadalupe County, New Mexico.
Courtesy of Leeward Renewable Energy
When combined with the new greenfield 145 MW Aragonne Mesa Wind project, the total wind farm output will increase to 235 MW.
As a part of this effort, GE will be providing a total of 86 2.x-127 and 2.3-116 wind turbine generators (WTG) to Leeward. The Aragonne Wind repower will replace the project’s 90 existing units with new WTG technology, resulting in increased performance and reliability. The projects are anticipated to be completed in late 2021.

Related Keywords

Colorado ,United States ,Illinois ,New Mexico ,Texas ,Sweetwater ,American ,Tim White ,Ge Renewable Energy ,Leeward Renewable Energy ,Courtesy Of Leeward Renewable Energy ,American Wind Energy Association ,Aragonne Wind ,Wind Project ,Guadalupe County ,Amesa Wind ,Mountain Breeze Wind ,Lone Tree Wind ,Renewable Energy Magazine ,At The Heart Of Clean Energy Journalism ,Wind Ge Renewable Energy Announces 235 Mw Repower And Expansion For Aragonne Project ,கொலராடோ ,ஒன்றுபட்டது மாநிலங்களில் ,இல்லினாய்ஸ் ,புதியது மெக்ஸிகோ ,டெக்சாஸ் ,இனிப்பான தண்ணீர் ,அமெரிக்கன் ,நேரம் வெள்ளை ,கே புதுப்பிக்கத்தக்க ஆற்றல் ,லீவர்ட் புதுப்பிக்கத்தக்க ஆற்றல் ,மரியாதை ஆஃப் லீவர்ட் புதுப்பிக்கத்தக்க ஆற்றல் ,அமெரிக்கன் காற்று ஆற்றல் சங்கம் ,காற்று ப்ராஜெக்ட் ,குவாடலூப் கவுண்டி ,மீசா காற்று ,மலை தென்றல் காற்று ,தனி மரம் காற்று ,புதுப்பிக்கத்தக்க ஆற்றல் பத்திரிகை ,இல் தி இதயம் ஆஃப் சுத்தமான ஆற்றல் பத்திரிகை ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.