Detailed text transcripts for TV channel - CNN - 20100618:13

Detailed text transcripts for TV channel - CNN - 20100618:13:35:00

we know because of the new flow rate numbers we need to increase capacity. additional vessels being brought into the area and anticipate by the end of the month of june and capacity will increase to 53,000 barrels a month. following that thought a decision made will be reached mass capacity with the recovery system we have on the scene with the containment cap. at that point the officers will be -- unbolt the plans, small section of pipe we needed to shear cut and replace it with a solid bolted on cap that can be linked to a new flexible production system and alloy us to use production platforms and shuttle tankers. once that's in place, we have the capability to increase capacity on the production to 60,000 barrels. that should be somewhere around the middle part of july. we continue to move forward on that. it is proceeding at a pace. regarding the relief wells, development driller three, drilling the first relief well, is now 10,677 feet below the sea

Related Keywords

Area , Vessels , Flow Rate Numbers , Decision , Barrels , Capacity , The End , 53000 , Point , Plans , Section , Officers , Recovery System , Containment Cap , Scene , Pipe , Us , Place , Capability , Production System , Production , Cap , Alloy , Production Platforms , Shuttle Tankers , 60000 , Part , Somewhere , Sea Floor , Feet , Relief Wells , Development Driller Three , Relief , July , Space , 10677 , Three ,

© 2025 Vimarsana