The Electricity Company of Ghana (ECG) has installed an 11-million-dollar Primary Substation with 52 mega volts amperes (MVA) and interconnecting circuits, within the catchments area of the University of Ghana Medical Centre (UGMC) to ensure stable power supply for quality healthcare delivery. The UGMC currently has a 1,000 bed-capacity, 12…