Gas injection system | Last manifolds completed in China : v

Gas injection system | Last manifolds completed in China


Gas injection system | Last manifolds completed in China
Contractors to the Chinese Domestic Agency have completed an important part of the gas injection system—the distribution manifolds that carry gas species from the tritium plant to the ITER machine and back for processing.
Members of ITER's Fuelling & Wall Conditioning Section inspect a batch of gas injection manifolds from China in June 2020. Manufacturing is now complete and the last batches will be shipped from China.Think of them as service pipes, with important added characteristics to meet ITER's strict regulations for protection-important components*.
Inside of a large guard pipe, six process lines for gas going toward the plasma surround a central evacuation pipe that transports exhaust gases back to the tritium plant. In the interspace is an inert gas (nitrogen) flowing toward tritium plant, where any leaks from the process pipes can be detected.

Related Keywords

Huizhou , Guangdong , China , Jilin , Chinese , , China Nuclear Industry Construction , Co Ltd , Southwestern Institute Of Physics , Chinese Domestic Agency , Wall Conditioning Section , Gas Injection Procurement , Plasma Physics , Chinese Academy , Southwestern Institute , Engineering Domain , துழௌ , குவாங்டாங் , சீனா , சீன , இணை லிமிடெட் , தென்மேற்கு நிறுவனம் ஆஃப் இயற்பியல் , பிளாஸ்மா இயற்பியல் , சீன கலைக்கழகம் , தென்மேற்கு நிறுவனம் , பொறியியல் களம் ,

© 2025 Vimarsana