Transcripts for CNN CNN Newsroom With Miguel Marquez 2014071

CNN CNN Newsroom With Miguel Marquez July 13, 2014 22:13:00

engineering. now, it's finally set to float again. for the past ten months, engineers have been hard at work, attaching metal boxes to either side of the "concordia." when the final checks are complete and the weather right, they will be able to drain the water from the boxes. in its place, they will pump compressed air, caution the ship to float. at first, they will raise it just two meters. it's a dangerous and tricky procedure. the ship is rotting and there's a real risk the bottom of it could give way. they will then tug the "concordia" 30 theaters in the east and lower some of the metal box on the starboard side of the ship. they will then attach more chain and cables to help reinforce the bottom. then, the full refloat begins, lifting the "concordia" up, deck by deck, clearing any debris along the way. once the ship is completely floated, they will tow it, slowly and carefully, 240 kilometers to the italian port

Related Keywords

Engineers , Work , Side , Metal Boxes , Engineering , Concordia , Weather , Checks , Ten , Place , Hair , Ship , Water , Bottom , First , Procedure , Rotting , Risk , Boxes , Two , Some , Chain , Cables , Metal Box , Theaters , 30 , It , Way , Deck , Debris , Refloat , Italian Port Of General , 240 ,

© 2025 Vimarsana