Winston Gold Corp.: Winston Gold Tests Crushing and Milling Circuit at Paradine Mill Facility WINNIPEG, MB / ACCESSWIRE / December 16, 2020 / Winston Gold Corp. ("Winston Gold" or the "Corporation") (CSE:WGC)(OTCQB:WGMCF) is pleased to announce that it is now crushing and milling low-grade material from its wholly-owned Winston Gold Mine through the leased Paradine Mill Facility, near Radersburg, Montana. Approximately 90 tons of low-grade gold-bearing material was crushed to a size of minus ½ inch mesh. The crusher was run at a rate of about 30 tons per hour and 50 tons of the crushed material was processed by the mill circuit. "Commissioning a mill is a multistage process," stated Murray Nye, CEO and Director of Winston Gold. "The crushing and milling circuit are now being thoroughly tested and any issues will be identified and fixed. Once the mill is fully commissioned, fine-tuning will begin, and operating costs will be documented for budgeting purposes and ongoing process improvements."