KPHO CBS 5 News At 530 November 30, 2016
Governor doug ducey made the announcement at the state capital along with representatives from lucid which is in california. The plan is to build a 700 Million Manufacturing plant to pump out luxury electric vehicles. 2000 jobs are expected to be created by the expansion. Construction is set to start next year along with [ indiscernible low volume ] the companys plan is to train and hire veterans,. Those who may casa grande are thrilled with hopefully we can have a job in town. Absolutely our little time town needed. We need it. Town needs it. We need it. Reporter casa grande was chosen over 6...