A MARQUEE game is to finish the Limerick hurling season with Monaleen taking on Mungret St Paul s in the Premier U21 decider on this Wednesday evening at Mick N.
MUNGRET ST Paul s are basking in glory this Sunday afternoon following a three-point win over Ballybrown that ensures they earn promotion to Group One of the Li.
PATRICKSWELL and Mungret St Paul s gave their hopes of reaching the knockout stages of the Bon Secours Limerick SHC knockout stages a huge boost with wins over .
NA PIARSAIGH are up and running in the Bons Secours Limerick SHC following a 1-23 to 1-14 win over Kildimo-Pallaskenry in their round two clash in Claughaun. Pe.
ALL THREE games in Group 2 of the Bons Secours Hospital Limerick SHC took place this Friday evening with wins for Ballybrown, Adare and Mungret St Paul s. Bally.
LIMERICK S U20 hurlers face into a crunch Munster Championship fixture when Cork come to the TUS Gaelic Grounds this Friday evening. Diarmuid Mullins side have.
They were right from the day the rig started up and they are still right. the truth is his other employees, other than me, barry duff, for one, said unequivocally and in writing, there are engineering engineering is not complete. it could result in catastrophic operator errors, which is what we ve seen on deepwater. his own federal judge, judge sparkin, the head of his ombuds office said in a letter that he did a complete investigation, which he is supposed to do because i complained to him about the problem. and he came back and said, you re right. the drawings are not done. they weren t done when the units started up and still aren t done. if tony wants to ignore that and use his own better answer, that s his decision. but i m sorry that s the approach he s taken. if they actually put this rig
He s denying there was ever any problem with the drawings. they were the right the day they started up. the truth is his other employees, other than me, barry duff, for one, said unequivocally and in writing, there are engineering engineering is not complete. it could result in catastrophic operator errors, which is what we ve seen on deepwater. his own federal judge, judge sparkin, the head of his ombuds office said in a letter that he did a complete investigation, which is he is supposed to do, because i complained to him about the problem. he came back and said can of you re right. the drawings are not done. they weren t done when the units started up and still aren t done. if tony wants to ignore that and use his own better answer, that s his decision. but i m sorry that s the
Problem with the drawings, they were the right the day the rig started up and they re still right. and you know, the truth is, keith, that his other employees, other than me, barry duff for one, have said unequivocally and in writing that there are engineering the engineering is not complete, it could result in catastrophic error, operator errors, which is what we ve seen on deepwater, and his own federal judge, judge sparkin, who s the head of his ombud s office, has said in a letter and in a press release to the a.p. that he did complete an investigation, which he is supposed to do because i complained to him about the problem, and he came back and said you re right, the drawings are not done, they weren t done when the unit started up and they re still done. and if tony wants toying nor that and use his own better answer, that s his decision. but i m really kind of sorry that that s the kind of approach he s taken. so let me guess. and i don t want to put words in