KPIX KPIX 5 News At 5AM July 14, 2024
Of the morning. 14 minutes right. 36 on 101 to get to the airport. Metering lights still not on at the bay bridge this morning, at least another 15 minutes for that. In the meantime, everything is moving on without big problems there. Same at the richmondsan rafael bridge. No construction this morning. No lane closures. That makes everything just a smooth ride in that westbound direction. San mateo bridge, not in focus but no brakes lights. Everything moving along in that westbound commute direction. Alameda county. Ace trains are back. Pg e gas line leak near the track was repaired. It was fo...