SFGTV December 21, 2013
Those roots will be done in a manner that will be acceptable to the arborist and we will be happy to engage the appellants arborist. And in regard to the additional excavation, and and the Water Proofing will be the top on the addendum but the package that will be reviewed to the dbi. Thank you. How do you handle the drainage that is exterior to the structure . We have the permit water system and a membrane and it will have a series of drains, below the slab that will be connected to a sump pump and it will be a permanent watering system and we will make sure that the walls are designed for th...