Expanded IP Surveys Outline an Additional 600m Strike Length to the Major Mineralized Corridor at Eloro Resources' Iska Iska Project, Potosi Department, Southwestern Bolivia : vimarsana.com
New chargeability high southeast of the MRE open pit indicates that the major mineralized structural corridor that is up to 800m wide extends a further 600m along strike to the southeast for an overall strike length of at least 2km. This new area has... - Veroeffentlicht am 29.01.2024