NTPC completes trial operation of Unit-2 of 660MW capacity at Nabinagar Super Thermal Project Posted On: 2021-04-01 05:44:14 (Time Zone: Arizona, USA) Based on achievement of approved norms, Unit-2 of 660 MW capacity of Nabinagar Super Thermal Power Project (3 x 660 MW) of Nabinagar Power Generating Co. Limited (a wholly owned subsidiary of NTPC Limited) has successfully completed trial operation and consequently included in the installed capacity of NTPC Group w.e.f. 31.03.2021. With this, the total installed capacity of NTPC group has become 65150 MW respectively. Shares of NTPC LTD. was last trading in BSE at Rs.107.75 as compared to the previous close of Rs. 106.45. The total number of shares traded during the day was 343692 in over 1715 trades.