Uranium Energy Corp Completes Initial 40 Development Holes at First Production Area of its Burke Hollow ISR Project in South Texas News provided by Share this article Highlights: Burke Hollow's initial Production Area ("PAA-1") is the newest and largest In-Situ Recovery ("ISR") wellfield being developed in the U.S.; Strong results demonstrate potential for further resource* growth within PAA-1 with several drill intercepts returning 2.45 to 4.48 grade thickness ("GT"). This is significantly above the 0.3 GT cut-off for ISR resource estimation and wellfield development; UEC's South Texas hub-and-spoke strategy is anchored by its fully licensed Hobson Processing Plant and includes five ISR Projects, including its fully permitted Palangana, Goliad and Burke Hollow projects; and