SFGTV December 22, 2012
Yes. The benefits of option 3, it does allow the construction of 3,000 feet of critical thank youerctionv that could make the possibility of an extension be real. Right. The downside of option 3 is that in order to accommodate for north beach station, you would the likelihood would be that you would have to remove these machines, which would be from a difficult operation in the future. Were currently looking at, though, to look at ways of perhaps diverting the machines, kind of off the path so that would either minimize or, you know, prevent the need to remove these machines. And normally when...