SFGTV April 11, 2015
Line is the north and the two vertical the blue lines well have horizontal and vertical plywood where we are demolishing the wall and then the blue line with the kicker will be a third level of shield where weer demolishing the wall so the process of demolishing the exterior wall so this shows well be using a excavator on the inside and have our skoovrl on the outside and our net in place and the final slide is the demolition sequence throughout our perimeters all the way down around the buildings will be cutting them up to into 4 by 8 seshthsz and hughes a using a hydraulics cutting the rebar...