ALJAZ Inside Story 2019 Ep 184 July 14, 2024
A one time functional check of one shear rivet in all 6 elevator pca bellcrank assemblies within 30 days reworking or replacing the bellcrank assembly if needed. Failure of 2 of the 3 bellcrank assemblies on one side can result in that single elevator surface but not both surfaces moving to a hard over position independent of the pilot command resulting in a significant pitch upset recoverable by the crew. Failure of all 3 bellcrank assemblies on one side can cause an elevator hard over that may result in loss of control ability of the airplane. Most people remember this case now to see one of...