SFGTV2 March 15, 2013
Units open for the express intent as he can facilitate the construction and enable the tenants to move within the building during construction and then let out the units when hes done with the construction. The building as indicated in this drawing is setback on all of these four sides. The 15foot plus in the front is substantial and impossible to make it see from across the street at a pedestrian view. There is the [speaker not understood] from the north that can be seen, but we set it off to the side to mitigate it. So, could i have a little more time . We didnt realize that the both mr. Low...