KGO ABC7 News 430AM August 29, 2013
Have been using it since the 1930s, is closed. We have coverage going with matt keller on the oakland side of the bridge. Next to the toll plaza at 200 yards away i step out the way and you can see the work being done on the bridge. The work during closure has to do with grinding and striping which takes time to cure and dry. The new span needs to be connected to land on the oakland side and the tunnel on the with the side. The challenging roth is demolition of the old westbound upper deck on the oakland side so the bicycle path can be connected. There is a final touch with birds nesting on th...