மைய புவியியல் கணக்கெடுப்பு News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from மைய புவியியல் கணக்கெடுப்பு. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In மைய புவியியல் கணக்கெடுப்பு Today - Breaking & Trending Today

Premier Su rules out rebuilding fourth nuclear power plant


Premier Su rules out rebuilding fourth nuclear power plant
04/01/2021 08:21 PM
Fourth nuclear power plant (CNA file photo)
Taipei, April 1 (CNA) Premier Su Tseng-chang (蘇貞昌) on Thursday categorically ruled out the possibility of rebuilding the mothballed Fourth Nuclear Power Plant, stressing that it cannot be and must not be rebuilt, despite an upcoming national referendum on the issue.
Su was quoted by Executive Yuan spokesman Lo Ping-cheng (羅秉成) when talking to reporters following a weekly Cabinet meeting, at which the premier was briefed by Hsu Yung-hui (許永輝), head of the Nuclear Power Division under state-run Taiwan Power Company (Taipower), on the controversial facility in New Taipei s Gongliao District. ....

T Ai Pei , Hsin Pei Shih , United States , Ma Ying Jeou , Huang Shih Hsiu , Chen Chun Hua , Su Tseng Chang , Flor Wang , Hsu Yung Hui , Nuclear Power Division , Atomic Energy Council , Fourth Nuclear Power Plant , Ministry Of Economic Affairs , Central Geological , Fukushima Daiichi Nuclear Power Plant , Taiwan Power Company Taipower , Nuclear Power Plant , Premier Su Tseng Chang , Executive Yuan , Taiwan Power Company , New Taipei , President Ma Ying Jeou , Fukushima Prefecture , Control Yuan , General Electric , Central Geological Survey ,

Lessons of Fukushima must not be forgotten


Lessons of Fukushima must not be forgotten
By Tsai Ya-ying 蔡雅瀅
On Feb. 14, a magnitude 7.3 earthquake occurred off the coast of Japan’s Fukushima Prefecture. The fact that the Fukushima Dai-ichi and Fukushima Dai-ni nuclear power plants have been decommissioned, and the Onagawa, Tokai Dai-ni, Higashidori and Kashiwazaki-Kariwa nuclear power plants are not operational might have prevented a nuclear accident.
Following the March 11, 2011, Tohoku earthquake, tsunami and resulting Fukushima nuclear disaster, Japan’s nuclear reactors were shut down in stages for safety checks. In June 2012, Japan for a while ran on zero nuclear power, which it did again for 11 months from September 2013. ....

Penghu Xian , United States , Japan General , Hsin Pei Shih , Fukushima Daiichi , Tsai Ya Ying , Central Geological , Fourth Nuclear Power Plant , Nuclear Power Plant , Fukushima Dai Ni , Tokai Dai Ni , Pacific Plate , North American , New Taipei City , Gongliao District , Central Geological Survey , Control Yuan , Legislative Yuan , The Taipei Times , ஒன்றுபட்டது மாநிலங்களில் , ஜப்பான் ஜநரல் , ஹஸின் பேய் ஷிஹ் , ஃபுகுஷிமா தய்ச்சி , ட்‌ஸை யா யிங் , மைய புவியியல் , நான்காவது அணு பவர் ஆலை ,

《TAIPEI TIMES》 Rail repair reassessment ordered - 焦點


根據「電腦網路內容分級處理辦法」修正條文第六條第三款規定,已於網站首頁或各該限制級網頁,依台灣網站分級推廣基金會規定作標示。 台灣網站分級推廣基金會(TICRF)網站:http://www.ticrf.org.tw
《TAIPEI TIMES》 Rail repair reassessment ordered
Minister of Transportation and Communications Lin Chia-lung, second left, inspects a damaged section of railway between Ruifang and Houtong stations in New Taipei City yesterday.
Photo: Cheng Wei-chi, Taipei Times
2020/12/11 03:00
LANDSLIDE AFTERMATH: Minister Lin Chia-lung said that the plan to reopen a railway section would be changed, as collapses on upper slopes had expanded
By Shelley Shan / ....

T Ai Pei , Hsin Pei Shih , Cheng Wei Chi , Central Geological , Water Conservation Bureau , Taiwan Railways Administration , China Engineering Consultants Inc , United Geotech Inc , Communications Lin , Taipei Times , Communications Lin Chia Lung , New Taipei City , Minister Lin Chia Lung , Shelley Shan , Central Geological Survey , United Geotech , டி ஐ பேய் , ஹஸின் பேய் ஷிஹ் , செங் வெய் சி , மைய புவியியல் , தண்ணீர் பாதுகாப்பு பணியகம் , சீனா பொறியியல் ஆலோசகர்கள் இன்க் , ஒன்றுபட்டது ஜியோடெக் இன்க் , தகவல்தொடர்புகள் லின் , தைப்பே முறை , தகவல்தொடர்புகள் லின் சியா நுரையீரல் ,

Rail repair reassessment ordered - Taipei Times


Rail repair reassessment ordered
LANDSLIDE AFTERMATH:
Minister Lin Chia-lung said that the plan to reopen a railway section would be changed, as collapses on upper slopes had expanded
By Shelley Shan / Staff reporter
Staff have been asked to reassess the time needed to reopen the damaged section of railway between Ruifang (瑞芳) and Houtong (猴硐) stations in New Taipei City, Minister of Transportation and Communications Lin Chia-lung (林佳龍) said yesterday following an inspection of the region.
Access to the section has been disrupted by a massive landslide on Friday last week triggered by days of heavy rainfall on Taiwan’s northeast coast.
The ministry had said that it might resume two-way operations on a single track by 5am on Sunday, but Lin said that timetable would be reset, as the situation is worse than had been estimated. ....

T Ai Pei , Hsin Pei Shih , Cheng Wei Chi , Central Geological , Water Conservation Bureau , Taiwan Railways Administration , China Engineering Consultants Inc , United Geotech Inc , Communications Lin , Taipei Times , Minister Lin Chia Lung , Shelley Shan , New Taipei City , Communications Lin Chia Lung , Central Geological Survey , United Geotech , டி ஐ பேய் , ஹஸின் பேய் ஷிஹ் , செங் வெய் சி , மைய புவியியல் , தண்ணீர் பாதுகாப்பு பணியகம் , சீனா பொறியியல் ஆலோசகர்கள் இன்க் , ஒன்றுபட்டது ஜியோடெக் இன்க் , தகவல்தொடர்புகள் லின் , தைப்பே முறை , அமைச்சர் லின் சியா நுரையீரல் ,