Galiano Gold Announces Preliminary 2020 Operating Results and 2021 Guidance News provided by Share this article VANCOUVER, BC, Feb. 16, 2021 /PRNewswire/ - Galiano Gold Inc. ("Galiano" or the "Company") (TSX: GAU) (NYSE American: GAU) reports preliminary fourth quarter ("Q4") 2020 operating results for the Asanko Gold Mine ("AGM"), located in Ghana, West Africa. The AGM is a 50:50 joint venture ("JV") with Gold Fields Ltd (JSE,NYSE: GFI), which is managed and operated by Galiano. All financial information contained in this news release are unaudited and reported in US$. Q4 and full year 2020 Asanko Gold Mine Highlights (100% basis) Exceeded annual production guidance: Annual gold production of 249,904 ounces, exceeding the upper end of 2020 production guidance of 225,000 - 245,000 ounces, with 65,571 ounces produced in the fourth quarter.