We were to have a Third Party Consultant because of the proposed building a potential contributor we are working closely with the team and very please line up on the screen side of the room pleased with the final design we feel it is a strong proposal are more conceptual with the fabric of the existing neighborhood the project present logic challenges a muni elevators on the premises and a muni escalator the tunnel in addition weve agreed were feasible to widen the 14th street sidewalk and setback our building 7 feet from the corner that adds better pedestrian assess around the building is an ...