SFGTV October 1, 2013
And rehab iting slip way four and creating a hard scape and a plaza area and a space that could be used as itheater, and rehab taiting 109 and 110 and creating a yard space that could be used for picnicking and gathering and possibly concessions and then we have what we call the maritime fields which is actually opening up slip ways, 1, 2, 3, back into the bay and bringing the bay back into the site and lastly we have what we call the urban beach on the northern portion of the site where we are taking basically, dumped concrete, removing it and creating a beach area that will accommodate, the ...