A massive lift floated down the Penobscot, concrete monoliths to follow
The bright red, steel structure of the lifting device is 110 feet tall, 111 feet wide and can lift 4,000 metric tons.
Stay updated with breaking news from Navy Shipyard Infrastructure Optimization Program. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The bright red, steel structure of the lifting device is 110 feet tall, 111 feet wide and can lift 4,000 metric tons.
Federal funding could be directed to Portsmouth Naval Shipyard to help take its ongoing dry dock expansion project over the finish line.
The Navy reported Tuesday that it had received a strong response from property owners in the Seattle-Tacoma area interested in leasing space to the military during a decadelong overhaul of the Puget Sound Naval Shipyard at Naval Base Kitsap.
Looking for the latest GovCon News? Check out our story: Navy Awards $112M Dry Dock Construction Contract to Cianbro. Click to read more!
America doesn't have enough ships and building more takes far too long.