SFGTV Transbay Joint Powers Authority 21116 March 1, 2016
Completed. They were delivered. On the steel that was offsite fabricated with delivered. All onsite basket consult on. Steel was fabricated at seven different sites. All on the west coast. I still came from the east coast for the most part. Casos came from the midwest in louisiana. All delivered last year. We completed other milestones we talked about going over firstrate also fremont street. July was a loca put together there that was installed during 2050. Some very dramatic architectural features that when in place. We did do other work besides steel. We did complete the train box lower wal...